How long does it take to complete a commercial design and build project?
Construction period and handover date
Time is money, especially in Hong Kong with fast moving pace and being the 3rd city with the highest rent. After meeting with you, our team could come up with a designed floor plan within 5 working days, with a fit out quotation with list in categories, preliminary works, flooring works, ceiling and partition works, plumping and drainage works, electrical works, air conditioning work, and furniture and fixture works. This fit out quotation aims to give idea whether the design you desire match with your budget.
When you desire to hire AVINCAS Project to be your interior designer and fit out contractor, our team provides 3D renderings and visual videos using the most latest design software, in 5 working days, which will give you a real look of your newly designed premises. You may make major or minor amendments at any time.
Once the design, material selection is completed and ready to commence, AVINCAS Project will do our preparation work, which also involve some procurement work. Normally, our team is able to shorten the construction period of a shop, restaurant and workplace with size in between 3,000 to 10,000 sqf. in 30 days.
Warranty period
AVINCAS Project provides 12 months of maintenance service from the project completion date.